Service – RAMS & SW Certification

RAMS engineering, certification and testing for railway and defense safety software

RAMS ENGINEERING · RAILWAY · DEFENSE · AUTOMOTIVE

RAMS engineering and software certification,
from system definition to the Safety Case

Safety software for railway on-board and wayside systems must follow IEC 62278 (EN 50126), IEC 62279 (EN 50128) and its successor EN 50716, and IEC 62425 (EN 50129), with defined activities and deliverables at every lifecycle phase.

One team at WellTech Lab handles the certification deliverables and testing — from plans and the System Definition through software requirements and design, static and dynamic testing, to the Safety Case. With experience at every level from SIL 0 to SIL 4, we let developers focus on development while certification takes the least possible time and cost.

  • Deliverables for the whole lifecycle (Plan → System Definition → … → Safety Case)
  • Covers software and UPIC (User Programmable Integrated Circuit: FPGA, CPLD, etc.) deliverables
  • Static testing with MISRA, CWE and CERT; dynamic testing with LDRA (Statement / Branch / MC/DC)
  • Support through certification-body assessments and audits
  • Experience beyond railway: defense (weapon-system software reliability testing) and automotive (ISO 26262)
SIL 0–4Experience at every level
Plan → Safety CaseDeliverables for the whole lifecycle
SW · UPICSoftware and UPIC (e.g. FPGA)
Static + DynamicSoftware reliability testing

LIFECYCLE

Support across the entire V-model lifecycle

Our scope within the EN 50126 system lifecycle and the EN 50128 / EN 50716 software lifecycle.

← Swipe to see the full diagram →

SYSTEM · EN 50126 / 50129 SOFTWARE · EN 50128 / 50716 Validation Verification Plan · System Definition Assessment · Approval Risk Analysis · Hazard Log Safety Case System Requirements System Validation SW Requirements Overall SW Validation SW Architecture · Design SW/HW Integration Test Component Design Component Test Coding · Static Test
  • System deliverables
  • Software deliverables
  • Static testing
  • Dynamic testing
  • Validation · Safety Case · Assessment

SERVICES

Services

01

Certification deliverables

We write the plans, specifications, designs and verification documents required by EN 50126 / 50128 (50716) / 50129, matched to the project SIL.

  • Planning (quality assurance, configuration management, verification and validation plans)
  • System Definition, risk analysis, Hazard Log management
  • Software requirements, architecture and design specifications with traceability
  • Safety Case and supporting evidence
02

Static testing

Coding rules and static analysis catch latent defects during implementation.

  • Coding-rule selection (MISRA, CWE, CERT, etc.)
  • Detection of rule violations and runtime errors
  • Design and data-flow review with call and flow graphs
  • Re-analysis after fixes and reporting
03

Dynamic testing

Requirements- and structure-based tests on the real target reach the coverage goals.

  • Test plans and test-case design (requirements- and structure-based)
  • Target-linked environment identical to development
  • Statement / Branch / MC/DC coverage testing with LDRA
  • Requirement and function coverage; support for accredited test certificates
04

Validation and assessment

We prepare the evidence required by independent safety assessment (ISA) and certification bodies, and join the audits.

  • Review of software integration test reports and explanations of unmet items
  • Audit checklists for static and dynamic testing
  • Consistency of tool versions, target files and target environment
  • Support for customer and certification-body acceptance schedules

DELIVERABLES

Key deliverables by phase

Adjusted to project scope and SIL. UPICs (e.g. FPGA) are covered with requirements, design and verification deliverables following the UPIC lifecycle in EN 50129 Annex F.

01 · Planning

Plan

  • RAMS / Safety Plan
  • Software Quality Assurance Plan
  • Software Configuration Management Plan
  • Software Verification Plan
  • Software Validation Plan

02 · System

System

  • System Definition
  • Preliminary Hazard Analysis
  • Hazard Log
  • System (Safety) Requirements Specification
  • FMECA / FTA

03 · SW requirements · design

Specification

  • Software Requirements Specification
  • Software Architecture Specification
  • Software Design Specification
  • Software Interface Specifications
  • Software Component Design Specification
  • Verification Reports per phase

04 · Testing

Test

  • Overall Software Test Specification
  • Software Integration Test Specification / Report
  • Software/Hardware Integration Test Specification / Report
  • Software Component Test Specification / Report
  • Static and dynamic test reports

05 · Validation · deployment

Validation

  • Overall Software Test Report
  • Software Validation Report
  • Tools Validation Report
  • Release Note · Deployment Records

06 · Safety demonstration

Safety Case

  • Safety Case (EN 50129)
  • Software Assessment support materials
  • Records of ISA findings and actions
  • Certification submission package

SAFETY INTEGRITY LEVEL

Experience at every level, SIL 0 to SIL 4

Higher SILs demand stricter techniques, independence and coverage. We know the requirements of each level and plan for them from day one.

  1. SIL 0Basic Integrity
  2. SIL 1Safety Integrity
  3. SIL 2Safety Integrity
  4. SIL 3Safety Integrity
  5. SIL 4Safety Integrity

Requirements get stricter to the right · Experience at every level

PROCESS

Process

  1. Scope · SIL review
  2. Schedule · criteria
  3. Deliverables · testing
  4. Assessment · certification

STANDARDS & TOOLS

Standards and tools

  • IEC 62278 / EN 50126
  • IEC 62279 / EN 50128
  • EN 50716
  • ISO 26262
  • DAPA weapon-system software manual (Korea)
  • IEC 62425 / EN 50129 (incl. UPIC Annex F)
  • MISRA C
  • CWE
  • CERT C
  • LDRA
  • Statement · Branch · MC/DC

TRACK RECORD

Track record

We have delivered software certification deliverables and testing in railway signaling, communications and rolling stock, defense weapon systems, and automotive and mobility.

SIL 44 certification projects supportedOn-board signaling, jointless track circuits, etc.
SIL 22 certification projects supportedTrain fire detection systems, etc.
  • 2026GA/SA for 1 SIL 4 and 2 SIL 2 certification support projects
  • 2025GA/SA for 3 SIL 4 certification support projects · train fire detection software development, certification and testing

Under non-disclosure agreements with our clients, details are not published. Please contact us for more information.

TÜV SÜDHyundai Rotem

※ Only clients who have agreed to be listed are shown.

INDUSTRIES

Railway, defense and automotive — each to its own standards

Centered on coding-rule checks and structural coverage testing, we deliver documents and tests to each industry’s standards and integrity levels.

RAILWAY

Railway

EN 50126 / 50128 / 50716 / 50129

  • Certification deliverables at SIL 0–4
  • Static and dynamic testing, Safety Case
  • Software and UPIC (e.g. FPGA)

DEFENSE

Defense

DAPA “Weapon System Software Development and Management Manual” (Korea)

  • Weapon-system software reliability testing
  • Static (coding rules) and dynamic (code coverage) tests with targets per software grade
  • Re-testing after code changes, reports and audit support
  • Migration and development of defense equipment operating software (VxWorks)

AUTOMOTIVE · MOBILITY

Automotive · Mobility

ISO 26262 functional safety (ASIL A–D)

  • Automotive and mobility software testing
  • Coding guidelines such as MISRA C applied and checked
  • Statement, branch and MC/DC structural coverage per ASIL; requirements-based testing

FAQ · GLOSSARY

FAQ and glossary

Can you join a project that is already under way?

Yes. We review the existing deliverables and the required SIL, list the missing activities and documents, and continue with you from the remaining phases.

Can we order only deliverables, or only testing?

Yes. Choose just what you need — deliverables, static testing, dynamic testing or assessment support.

How is project information protected?

Every project runs under an NDA, and we never disclose client names or project details without consent.

SIL (Safety Integrity Level)

Safety integrity level, graded 0–4 by the risk if a function fails; the higher the level, the stricter the development and verification requirements.

ISA (Independent Safety Assessment)

An assessor independent of the development organization evaluates whether lifecycle activities and deliverables meet the standard.

V&V (Verification & Validation)

Checking that each phase meets the previous phase’s requirements (verification) and that the final result fits its intended use (validation).

MC/DC (Modified Condition / Decision Coverage)

Structural coverage showing that each condition independently affects the decision outcome — stricter than statement or branch coverage and common at high integrity levels.

UPIC (User Programmable Integrated Circuit)

Integrated circuits such as FPGAs and CPLDs whose logic is designed by the user; in railway, EN 50129 Annex F covers the UPIC lifecycle and verification.

EN 50716

The railway software standard published in 2023, unifying EN 50128 (signaling and control) and EN 50657 (on-board rolling stock).

Safety Case

A structured argument, with evidence (analyses, test results, management records), that the system meets its required safety level — the key submission for certification.

Shape the future with WellTech Lab’s expert engineers.

Ask us anything about software development, certification or IT consulting — we will get back to you quickly.